SG Power Products Pvt. Ltd.  |  Last updated: 26 October 2026

SG Power Products Pvt. Ltd. is a transformer manufacturer based in Noida, Uttar Pradesh, and a transformer supplier to projects across India. We make oil cooled distribution transformers, HT AVR transformers with on-load tap changers, LT step-up and step-down transformers, dry type transformers, and furnace transformers for industries, utilities, solar plants, buildings and infrastructure projects. Our distribution transformers are built to IS 1180 and IS 2026, with copper windings and full routine testing before dispatch.

A transformer runs 24 hours a day for 25 years or more, so its losses, winding quality and voltage stability decide the power bill and the life of every machine connected to it. An HT AVR transformer also keeps the plant voltage steady when the grid voltage swings, without a separate stabilizer.

As a distribution transformer manufacturer and transformer supplier, we build standard ratings and custom designs for new connections, capacity upgrades and replacements. EPC contractors, utilities and industry, including Indian Railways, L&T, NTPC and BHEL, have sourced electrical equipment from SG Power.

SG Power oil cooled distribution transformer

Key Facts: SG Power Transformers

Manufacturer: SG Power Products Pvt. Ltd., Noida, Uttar Pradesh, India.

Products: Distribution, HT AVR (with OLTC and AVR relay), LT step-up and step-down, dry type and furnace transformers.

Voltage: 11, 22 and 33 kV HT to 415 V or 433 V LT, plus custom LT ratios.

Ratings: 25 kVA to 500 kVA for distribution, dry type and furnace transformers.

Construction: Step-lap CRGO core, high BDV oil and ONAN cooling, or oil-free dry type (cast resin or VPI); efficiency 98% to 99%.

Standards: IS 1180 and IS 2026, with losses designed to BEE 4-star / 5-star levels; ISO 9001:2015 certified manufacturing.

Testing: Routine tests in our in-house laboratory, with a test certificate, GA drawing and GTP for every unit.

Supply: Across India, including remote project sites.

Procurement Summary

ItemDetails
ProductsDistribution transformers; HT AVR transformers (with OLTC and AVR relay); LT step-up and step-down transformers; dry type transformers; furnace transformers
RatingsDistribution, dry type and furnace: 25 kVA to 500 kVA; HT AVR: 500 kVA to 10 MVA
Voltage classHT: 11 kV, 22 kV, 33 kV; LT: 415 V / 433 V and custom; dry type: 11 kV and 33 kV class
CoolingONAN (oil natural, air natural) for oil filled units; air cooled, oil-free for dry type (ventilated, cast resin or VPI)
WindingCopper
StandardsIS 1180, IS 2026; IS 11171 for dry type; losses designed to BEE 4-star / 5-star levels; ISO 9001:2015
TestingRoutine tests on every unit in our in-house laboratory; type test reports
DocumentationGA drawing, rating plate drawing, routine test certificate, manual
Payment termsProduction begins on receipt of 50% advance
DeliveryPan-India, including remote project sites

What Is a Transformer?

A transformer is a static electrical machine that changes AC voltage from one level to another through electromagnetic induction, without changing the frequency. A distribution transformer, for example, steps 11 kV from the utility line down to 433 V so factories, buildings and pumps can use it.

A transformer does three jobs in a power system:

Changes the voltage: steps it down for use (step-down) or up for transmission or special loads (step-up).

Isolates circuits: the primary and secondary windings are separate, which limits fault spread between the HT and LT sides.

Regulates supply: with taps, an on-load tap changer or an AVR, it holds the output voltage close to the rated value.

Types of Transformers

SG Power makes five types of transformers: distribution, HT AVR, LT step-up and step-down, dry type and furnace transformers. The two tables below compare them by function, voltage regulation, rating, cooling and best use.

FeatureDistribution transformerHT AVR transformerLT step-up / step-down transformer
What it doesSteps HT (11, 22 or 33 kV) down to LT (415 V or 433 V)A copper-wound “two-in-one” unit that stabilizes the 11, 22 or 33 kV supply and steps it down, holding the LT output within ±1%Changes one LT voltage to another, e.g. 415 V to 230 V or 415 V to 690 V
Voltage regulationOff-circuit taps, ±5% or ±7.5%; OLTC on requestAutomatic, on load, LT output within ±1%Fixed ratio or off-circuit taps
Typical rating25 kVA to 500 kVA500 kVA to 10 MVA25 kVA to 2500 kVA
CoolingONAN, oil filledONAN, oil filledDry type or ONAN
Best suited forUtility connections, factories, buildings, solar plantsSites with high or low grid voltage, sensitive process loads, long feedersImported machines, special voltages, isolation of circuits

Special-duty transformers we make:

FeatureDry type transformerFurnace transformer
What it doesSteps HT down to LT with no oil; ventilated, cast resin or vacuum resin impregnated (VPI) designsFeeds the rectifier and inverter panel of a medium-frequency (500 or 1,000 Hz) induction furnace
Voltage regulationOff-circuit taps; OLTC on requestOff-circuit taps
Typical rating25 kVA to 500 kVA25 kVA to 500 kVA
CoolingAir cooled, oil-freeONAN
Best suited forIndoor substations, fire-sensitive buildings, humid or chemically polluted sitesInduction melting in steel plants, foundries and alloy plants

Other common ways to classify transformers:

By phase: single phase and three phase.

By cooling: oil cooled (ONAN, ONAF) and dry type (air cooled, cast resin).

By winding material: copper wound and aluminium wound.

By core: CRGO steel and amorphous metal.

Our Range of Transformers

We manufacture distribution, HT AVR, LT step-up and step-down, dry type and furnace transformers, so one transformer manufacturer can supply the HT connection, voltage regulation, indoor substations and process power on a project.

ProductWhat it isBest suited for
Distribution transformerThree phase, oil cooled (ONAN), 11/0.433 kV, 22/0.433 kV or 33/0.433 kV, 25 kVA to 500 kVA, step-lap CRGO core, copper woundUtility-supplied factories, commercial buildings, housing, solar and pumping
HT AVR transformerCopper-wound “two-in-one” HT stabilizer and transformer for 11, 22 or 33 kV, holding the LT output within ±1%, for indoor or outdoor installation, 500 kVA to 10 MVAIndustrial plants on unstable HT supply, hospitals, data centres, process lines
LT step-down transformer415 V down to 230 V, 110 V or as specified, 25 kVA to 2500 kVA, dry type or oil cooledLighting, controls, imported equipment, separate LT circuits
LT step-up transformer415 V up to 690 V or as specified, 25 kVA to 2500 kVAMotors and machines rated above 415 V, long LT cable runs
Dry type transformerThree phase, ventilated, cast resin or VPI, 11 kV or 33 kV class, 25 kVA to 500 kVA, oil-free and fire-safeIndoor substations, high-rise buildings, hospitals, malls, metro and data centres where oil is a fire risk
Furnace transformerHeavy-duty transformer feeding medium-frequency induction furnace panels, 25 kVA to 500 kVA, built for high currents and frequent short circuits during meltingSteel melting shops, foundries and alloy plants

All transformers can be supplied with options such as off-circuit tap switch, Buchholz relay, oil and winding temperature indicators, cable box or bushings, and marshalling box.

Which Transformer Should You Choose?

Use this quick guide to shortlist the transformer, then confirm the rating with the selection guide below.

Your needRecommended transformer
New HT connection (11 kV or 33 kV) for a factory or buildingDistribution transformer
Grid voltage swings, causing trips or machine damageHT AVR transformer with OLTC
Long HT feeder with high or low voltage at the endHT AVR transformer
Indoor substation, basement or high-rise where oil is not allowedDry type transformer
Supply for an induction furnaceFurnace transformer
Imported machine rated 380 V, 400 V or 690 VLT step-down or step-up transformer
Separate 230 V or 110 V supply for lighting or controlsLT step-down transformer
Motor or equipment rated above 415 VLT step-up transformer
Solar plant feeding the gridDistribution transformer, inverter-duty

Technical Specifications

SG Power distribution transformers are three phase, 50 Hz, ONAN units from 25 kVA to 500 kVA for 11, 22 or 33 kV to 415 V or 433 V, with Dyn11 vector group, step-lap cores, efficiency of 98% to 99% and losses per IS 1180, designed for 50 °C ambient. Specifications for dry type and furnace transformers follow in the second table.

ParameterDistribution transformerHT AVR transformerLT step-up / step-down
Rating25 kVA to 500 kVA500 kVA to 10 MVA25 kVA to 2500 kVA
Primary voltage11, 22 or 33 kV11, 22 or 33 kV415 V or as specified
Secondary voltage415 V or 433 V415 V or 433 V230, 110, 690 V or as specified
Phase and frequencyThree phase, 50 HzThree phase, 50 HzSingle or three phase, 50 Hz
Vector groupDyn11 (standard)Dyn11 (or as specified)As specified
CoolingONANONANDry type / ONAN
WindingCopperCopperCopper
CoreStep-lap CRGO core for low noise and low no-load lossAs distributionNA
Voltage regulationOff-circuit taps, ±5% or ±7.5%; OLTC on requestHT stabilization; LT output within ±1%Fixed or off-circuit taps
Impedance4% (25 to 63 kVA); 4.75% (100 to 250 kVA); 5% (315 to 500 kVA)As distributionAs per design
Efficiency98% to 98.5% (25 to 100 kVA); 98.5% to 99% (160 to 500 kVA)NAAs per design
LossesLow no-load and load losses per IS 1180; designed to BEE 4-star / 5-star levelsAs distributionAs per design
Temperature riseOil 35 °C; winding 45 °CAs distributionAs per design
Insulation levelHV 95 kV BIL (11 kV system); LV 3 kV (1.1 kV system)As distributionAs per design
Design ambient50 °C, 100% humidity50 °C, 100% humidityNA
Oil and protectionHigh BDV oil; moisture-resistant insulation; anti-corrosion, tropicalised finishAs distributionNA
StandardsIS 1180 (Part 1), IS 2026As distributionIS 2026 / IS 11171
FittingsConservator, breather, oil level gauge, OTI, WTI, Buchholz relay, cable box or bushingsAs distribution, plus AVR control panelTerminal box, enclosure IP rating

Special-duty transformers (dry type units are designed to IEC 60076-11 and IS 11171):

ParameterDry type transformerFurnace transformer
Rating25 kVA to 500 kVA25 kVA to 500 kVA
Voltage class11 kV and 33 kVNA
Secondary voltage433 V or as specifiedAs per furnace panel
DesignVentilated, cast resin or vacuum resin impregnated (VPI)Induction furnace duty, for medium-frequency (500 or 1,000 Hz) panels
CoolingAir cooled, oil-freeONAN
InsulationClass H or E, rated 180 °C or 220 °CClass H or E, rated 180 °C or 220 °C
WindingCopperCopper
Voltage controlOff-circuit taps; OLTC on requestNA
DutyIndoor, continuous; fire-safe with minimal, non-toxic smoke; suits humid and chemically polluted areasHeavy duty: high currents and frequent short circuits during melting
StandardsIS 11171, IEC 60076-11IS 2026

GA drawings, rating plate drawings and guaranteed technical particulars (GTP) are available on request.

How to Select the Right Transformer

To select a transformer, add up the load in kW, convert it to kVA, add 20 to 25% for growth, then match the voltages, voltage regulation, loss level and site conditions. Follow these seven steps:

1

Add up the load. List the connected load in kW, then multiply by a demand (diversity) factor, usually 0.6 to 0.8 for industry.

2

Convert to kVA. Divide the maximum demand in kW by the power factor. For example, 200 kW x 0.8 demand factor = 160 kW; 160 kW / 0.9 PF = about 178 kVA.

3

Add room for growth. Add about 20 to 25% for future load and choose the next standard rating. In the example, 178 kVA plus 25% is about 222 kVA, so a 250 kVA transformer fits.

4

Confirm the voltages. Match the primary to the utility supply (11, 22 or 33 kV) and the secondary to the equipment (433 V, or a special LT voltage through a step-up or step-down transformer).

5

Decide on voltage regulation. If the grid voltage swings enough to trip drives or damage machines, or the load is sensitive, choose an HT AVR transformer with OLTC instead of a separate stabilizer.

6

Choose the loss level. A lower-loss transformer costs more but saves energy every hour for 25 years; compare total owning cost, not purchase price.

7

Check the site. Plan for oil containment, ventilation, clearances and a sound earthing system, and follow the utility's approval requirements.

Special-duty transformers: for a dry type transformer, also confirm the room size, ventilation and insulation class. For a furnace transformer, share the furnace type, capacity in tonnes, power rating and the furnace panel maker's input requirement.

Our application engineers can size the transformer for your load and supply. We also supply servo voltage stabilizers, chemical earthing electrodes for transformer neutral and body earthing, and lightning arresters for the substation.

Why Choose SG Power as Your Transformer Manufacturer?

Buying from a transformer manufacturer, not a trader, gives you control over winding material, losses, testing and documents for utility approval. These are the reasons EPC contractors, industries and developers choose SG Power.

1

Low losses, low noise. Step-lap CRGO cores cut noise and no-load losses for 98% to 99% efficiency, and every unit is designed for 50 °C ambient and 100% humidity.

2

Five transformer types, one supplier. Distribution, HT AVR, LT step-up and step-down, dry type and furnace transformers come from one manufacturer, with matching designs and documents.

3

Built-in voltage regulation. HT AVR transformers hold the plant LT voltage within ±1% on load, removing the need for a separate HT or LT stabilizer.

4

Routine tested before dispatch. Every unit passes ratio, resistance, insulation, no-load and load loss, and voltage withstand tests in our in-house laboratory, with a test certificate.

5

Utility-ready documents. GA drawings, GTP and test certificates are prepared for DISCOM and consultant approval.

6

Complete substation package. Transformers with lightning arresters, earthing electrodes, earthing strips and earth pit covers, designed to work together.

7

After-sales and site support. Our engineers handle testing and commissioning, annual maintenance contracts (AMC) with priority response, and repairs at our testing and repair facility.

8

Certified, registered manufacturer. SG Power is an ISO 9001:2015 certified organisation, registered with MSME and SSI, and has received CE certification.

How We Manufacture and Test Every Transformer

Every SG Power transformer goes through the same controlled steps, from design to dispatch:

1

Design: electrical and mechanical design to your kVA, voltages and loss limits, with GA drawing and GTP for approval.

2

Core building: CRGO steel laminations cut and stacked to keep no-load losses low.

3

Winding: copper HT and LT windings wound and insulated, or cast in resin for dry type transformers.

4

Core-coil assembly and drying: the active part is assembled and dried in an oven to remove moisture.

5

Tanking and oil filling: oil is filled under vacuum in oil cooled units, and fittings are mounted.

6

Routine testing: ratio, resistance, vector group, no-load and load losses, insulation resistance and voltage withstand tests on every unit.

7

Painting and dispatch: painted, marked with the rating plate and dispatched with the test certificate.

Certifications, Approvals and Test Reports

Certification / approvalDetails
Quality managementISO 9001:2015 certified organisation
Company certificationsCE certified; RoHS compliance certificate No. UQ-2024081715 (UKCert, valid to 16 August 2027) covering SG Power’s servo stabilizers, rectifiers, surge protection, earthing and lightning protection products
Design standardsManufactured in accordance with Indian Standards: IS 1180 for distribution transformers, IS 2026 for power transformers and IS 11171 for dry type transformers
BEE energy efficiencyDistribution transformers designed to meet 4-star / 5-star energy performance levels, with no-load and load losses within IS 1180 limits
In-house testing laboratoryFully equipped in-house laboratory; routine tests on every unit before dispatch, with a test certificate
Business registrationsMSME and SSI registered

Transformer Supplier Across India

SG Power is a transformer supplier to industries, utilities and project sites across India, from metro cities to remote solar parks.

Standard ratings: common distribution ratings are built to a regular schedule.

Custom designs: special voltages, OLTC and AVR, dry type and furnace transformers, and custom fittings are built to order.

Safe transport: units are dispatched filled with oil and braced on trailers.

Complete documentation: test certificate, GA drawing, GTP and manual come with each unit, ready for approval.

Clear commercial terms: production starts on receipt of 50% advance; balance terms are agreed per order.

As a transformer supplier in Delhi NCR, we deliver quickly from Noida to Delhi, Ghaziabad, Gurugram and Faridabad.

Transformer Manufacturer in Noida and Delhi NCR

SG Power is a transformer manufacturer and supplier based in Sector 62, Noida. Being in Noida, close to Greater Noida, Ghaziabad and Delhi, means faster site visits, quicker delivery and easier factory inspections for buyers in Delhi NCR. Our engineers visit sites across the region to check loads, voltages and installation conditions before we quote.

How to Choose a Transformer Manufacturer or Supplier

Two transformers with the same kVA can differ widely in losses, winding material and build quality, and the difference shows in the power bill and in failures years later. Use these checks to compare transformer manufacturers and suppliers.

What to checkWhy it matters
Guaranteed no-load and load losses in writingLosses cost money every hour for 25 years or more
Energy efficiency level (BEE) and BIS markingUtilities and tenders often require them for distribution transformers
Winding material (copper or aluminium)Affects losses, size, overload capacity and repairability
Routine test certificate for every unitProves ratio, losses and insulation before the unit reaches site
Type test reports from a recognised labShows the design withstands impulse, temperature rise and short circuit
OLTC make and AVR relay make (for HT AVR transformers)The tap changer is the moving part; its quality decides reliability
Duty rating for furnace transformersProcess loads bring high currents, harmonics and frequent overloads, so the design must be rated for them
Insulation class and partial discharge test (for dry type transformers)Decides the temperature rating and long-term reliability indoors
Manufacturer, not traderCustom ratios, faster repairs and direct access to the designers
Documents for utility approvalGA drawing, GTP and test certificates speed up DISCOM approval
Service support and oil testingKeeps the transformer healthy through its life

Tender and BOQ Specification Text

Engineers and consultants can use this text in tender documents and BOQs. Adjust the type, rating and fittings to the project. The values in square brackets are the ones you fill in.

Design, manufacture, testing and supply of [X] kVA, [11/0.433] kV, three phase, 50 Hz, oil immersed, ONAN cooled, [copper] wound distribution transformer, vector group [Dyn11], with [off-circuit tap changer, ±5% in 2.5% steps / on-load tap changer of +X% to −X% in X steps with AVR relay and RTCC panel], losses not exceeding [energy efficiency level X of IS 1180], impedance [X]%, complete with conservator, silica gel breather, oil level gauge, OTI, WTI [and Buchholz relay], [HT and LT cable boxes / bushings], and first filling of transformer oil, conforming to [IS 1180 / IS 2026]. Routine test certificates and GA drawing to be submitted for approval. Make: SG Power or approved equivalent.

For a dry type transformer:

Design, manufacture, testing and supply of [X] kVA, [11/0.433] kV, three phase, 50 Hz, [cast resin / VPI] dry type transformer, AN cooled [with provision for AF fans], [copper] wound, vector group [Dyn11], insulation class [F], with off-circuit taps [±5% in 2.5% steps], winding temperature scanner, [IP23] enclosure and cable boxes, conforming to [IS 11171 / IEC 60076-11], with routine test certificate including partial discharge test.

For furnace transformers, we prepare tender text from your furnace data.

Commercial and Inspection Terms

TermDetails
Payment termsProduction begins on receipt of 50% advance
DocumentsGA drawing, GTP, routine test certificate, manual
WarrantyAs per the techno-commercial offer

HSN code, GST rate, minimum order quantity, lead time, freight, inspection and commissioning terms are confirmed in the techno-commercial offer for your enquiry.

Applications by Industry

Transformers are used wherever power must be taken from the utility grid or changed to a different voltage.

SectorTypical useSuggested transformer
Manufacturing plantsMain HT connection and plant powerDistribution transformer; HT AVR on unstable supply
Steel plants and foundriesInduction furnace supplyFurnace transformer
Textile, plastic and process industriesVoltage-sensitive drives and machinesHT AVR transformer
Hospitals and data centresStable supply for critical loads; indoor substationsHT AVR transformer; dry type transformer
High-rise buildings, malls and metroIndoor substations where oil is a fire riskDry type transformer
Commercial buildings and housingBuilding supply from 11 kVDistribution transformer
Solar power plantsInverter output to grid connectionDistribution transformer
Water supply and agriculturePumping stationsDistribution transformer
Imported machinery380 V, 400 V or 690 V equipmentLT step-down or step-up transformer
Railways and infrastructureStation, depot and site supplyDistribution transformer; LT transformers

Transformer FAQs

Request a Techno-Commercial Offer

Send us your requirement and our engineers will reply with a techno-commercial offer, guaranteed losses, a GA drawing and the delivery schedule. Please include:

Transformer type (distribution, HT AVR, LT step-up/step-down, dry type or furnace) and kVA rating; for furnace transformers, also the furnace capacity

HT and LT voltages, vector group and tapping range

Winding material (copper or aluminium) and energy efficiency level

Indoor or outdoor installation, and any utility approval needed

Site location, quantity and delivery schedule